Pavement Management Systems
|
Structurally failed asphalt allows penetration and contributes to eventual potholes. The first step in improving and protecting your asphalt investment is repairing areas that have structurally failed. |
|
Installation and compaction of hot asphalt to complete repair of damaged area. |
|
Correct preparation of the asphalt surface is imperative to insure the desired finish. Heating and removal of excess oil found in parking stalls. |
|
Cracks greater than ¼" width being filled with Western Colloid Flex Crack or hot pour crack filler. |
|
High pressure air blowers and industrial brooms are used to remove surface dirt and debris. |
|
For large, dirty parking lots - use of a water truck is recommended. |
|
Edgework is most effectively completed using a hand squeegee or broom. |
|
Machine application ensures a uniform surface and shortens lot closure time. |
|
Machine applied pavement markings provide a crisp, straight appearance. |
|